Blind Side Walls or One Sided Forms

Application Photos

 

VA Medical Center
Memphis, TN
GC: Caddell Construction Co. Inc.
Memphis, TN

Three story seismic shear wall retrofit.
The new wall was placed 3" to 4" from existing structure.

The assembled (ganged formed) blind side wall panel before it was lifted to a vertical position.
 
This is a view of the backwall of the wall panel prior to the concrete pour.
 
Note the slits placed in the stay-form to allow the installation of the hook tie.
 
This entire wall section is filled with concrete, but only the bottom half has been vibrated.
 

Stay-form: the forming and shotcrete problem solver.
Contact AMICO Stay-form
1-800-769-7642 ext. 205 or sales@amico-us.com



© Alabama Metal Industries Corporation. All Rights Reserved.