Berry Street Tunnel / Airport Busway

Pittsburgh, PA

  • GC: Mosites Const. Comp. Pittsburgh, PA
  • Engineers:
    -Sauer Design and Consulting Comp. (Herndon, VA)
    -ICF Kaiser Engineers, Inc. (Pittsburgh, PA)
    -Michael Baker Jr., Inc. (Coraoplis, PA)
  • Stay-form Dealer: George Wilson & Co.  Pittsburgh, PA

Stay-form was used as a backstop for the shotcrete applications. Stay-form was attached on the outside of the tunnel to truss girders and after an application of welded wire mesh prior to the application of the shotcrete.

Related Links


© Alabama Metal Industries Corporation. All Rights Reserved.